Offshore Welding Ndt Qc Onboard Pipelay Vessel

  • Luanda, Angola
  • Start Date : ASAP
  • Published on : 20/11/2024

Description

MISSIONS / SERVICE DIMENSIONS
The Service holder is responsible, under the Offshore CPY Site Representative onboard Rigid Pipelay Vessel, for following up, monitoring and supervising Welding / NDT (including AUT) activities carried out by the SURF Contractor and/or Subcontractors onboard vessel, ensuring that his discipline’s contractual and technical requirements are duly applied by the Contractor and/or Subcontractors.
Accountabilities
In this respect, and to ascertain that the equipment/facilities are built as per the project requirements, the Service holder shall ensure that Contractor and/or Subcontractors are following the approved drawings, fabrication procedures and methodologies, and ensure that Contractor and/or Subcontractors have adequate equipment, resources, means and manpower to perform the Service with the required quality level and to complete it in due time.
During the Welding / NDT activities, the Service holder will have to ensure the qualified welders and welding operators are working in accordance to approved welding procedures.
The Service holder organizes and participates to routine and random inspections, assists to daily / regular installation meetings related to his discipline with SURF Contractor and/or Subcontractors, performs QA/QC tours and ensures an adequate reporting on a day-to-day basis to the Offshore CPY Site Representative onboard Rigid Pipelay Vessel (areas of concerns, problems encountered in its discipline).
As a general manner, the Service holder provides assistance to the Offshore CPY Site Representative onboard Rigid Pipelay Vessel with all matters related to his discipline and is also accountable for demonstrating, individually, an exemplary behavior with regard to HSE rules & requirements.

ACTIVITIES
1. To adopt and to demonstrate an exemplary behavior regarding Company Ethics and “Code of Conduct” policy and HSSE rules and regulations.
2. To have knowledge of Company and Project technical referential and international standards related to his area of responsibility, taking knowledge from them for application to the Project. To develop, as required, discipline specific instructions onboard vessel.
3. To ensure proper answer (in coordination with Offshore CPY Site Representative onboard Rigid Pipelay Vessel) to CONTRACTOR technical Queries related to his discipline. To ensure promotion, implementation, and achievement by SURF Package offshore personnel of the Company Ethics and “Code of Conduct” policy.
4. To ensure all along installation phase that the SURF Contractor is enforcing his contractual commitments, is implementing properly his vessel execution plan, and is performing safely his activities as per Project specifications, design and codes.
As such, he shall:
- Participate to daily/regular meetings with Contractor/Subcontractors about NDT/QC discipline matters.
- Monitor and control the implementation onboard vessel of the approved welding and NDT procedures, Surveillance plans, Inspection and test plans.
- Ensure that the works are closely inspected by the contractor’s QC inspection team.
- Review and ensure that all material certificates and certification files are up to date, including documentation from vendors and contractors
- Challenge Contractor and Subcontractors on QA/QC performance and Inspection activities, and to perform routine and random inspections on a daily basis in this regard.
- Monitor the work deficiencies (repair rate in particular) and ensure the implementation of the necessary corrective actions. - Follow up on the implementation of decided action plans, or other mitigation plan issued.
- Report immediately to Offshore CPY Site Representative onboard Rigid Pipelay Vessel any anomaly or non-conformity
- Interface with SURF Contractor’s QA/QC authority onboard vessel on QA/QC issues and on the implementation of the Company QA/QC requirements.
- Participate to HSE or QAQC specific audits or visits.
- Provide regular inspection & activity reports
5. To ensure the tracking of anomalies and non-conformities performed by the SURF Contractor and ensure follow-up of correcting activities.
6. In general:
- To assist the Offshore CPY Site Representative onboard Rigid Pipelay Vessel as and when required.
- Witness of welding operations, welding operator qualification and equipment, including acceptance criteria.
- Review of NDE techniques and NDE Operatives and acceptance criteria; Assessment and evaluation of welding environment and facilities onboard, including arrangements for personnel protection and HSE.
- Examination and assessment of materials and consumables.
- To participate to the resolution of any discipline-related problem occurring during the Installation Phase, to review and give recommendation on technical deviation requests and to keep updated the documentation related to the disciplines.
- To provide technical support and assistance to Company personnel on discipline issues, and also to Contractor' and Subcontractors' personnel if needed.
- To implement discipline methods for the supervision of the day-to-day activities.
- To enforce decisions/directions taken at SURF Management level and as directed by Offshore CPY Site representative onboard Rigid Pipelay Vessel.
7. To report to the Offshore CPY Site representative onboard Rigid Pipelay Vessel to discipline activities, in particular when deviations to works are detected.
8. To ensure confidentiality of all the documentation issued under his area of responsibility.

CONTEXT & ENVIRONMENT
PBF is the brownfield project division of TotalEnergies E&P Angola and benefits of a matrix organization. It’s managing projects from FEED/Basic Engineering to Startup/ hand-over to Block Field Operation teams.
The nature of the brownfield projects, i.e., most of the execution activities offshore are executed in SIMOPS on live FPSOs (Girassol, Dalia, Pazflor, CLOV on Block 17 and Kaombo Norte and Sul on Block 32) and congested seabed, increases the risks and consequently the challenges of the projects (co-activities with other projects and maintenance activities, minimization of production shortfalls…).
PBF is managing EPCI contracts with major international Contractors but also local players including onshore prefabrication in Angola, offshore construction, and Installation (FPSO modifications, SURF, SPS, SIMOPS, high number of contractors & subcontractors).

DURATION / LOCATION
- Location: Offshore Angola
- Status: rotational
- If rotational, rhythm: 4 weeks mission

Qualifications & Experience required
- Professional Experience (years): minimum 10 years of experience
- Experience in similar position (years): more than 5 years of experience with project supervision in relation with SURF welding / NDT (including AUT) activities.
- Level / Diploma: Engineer, or equivalent
- Languages: English mandatory
- Qualifications: The Service holder should have UT Level II certification and CSWIP or equivalent welding inspector certification- HSE: BOSIET, HUET