Area Leader - Oil Treatment Unit Services

    • Start Date : 01/11/2026
    • Published on : 04/08/2026

    Description

    Qualifications/Experience required
    • Engineering degree or equivalent in related discipline with experience in pre-commissioning within Oil & Gas
    • Minimum 15 years’ experience in oil and gas projects, with extensive multi-discipline pre-commissioning and Oil Gas construction experience
    • Good knowledge of TOTAL E&P General Specifications and/or previous experience with other major Contractors in oil and gas construction projects.
    • The ideal candidate shall be fully conversant with the applicable Oil and Gas Industry International Codes, Standards as well as best Industry Practices.
    • A good awareness of other disciplines. Significant responsibility in multi-discipline teams or projects.
    • Excellent leadership, communication, and organizational skills.
    • Fluent in English.
    • Valid medical certificate per company standards.

    Location Buliisa site on Rotation
    Duration 18 months+
    Status Rotational 4x4

    There is no equivalent project of such an industrial drilling magnitude in a remote and sensitive area within the Company today.
    The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area, and within densely populated area in a rural and remote part of Uganda. Activities exposed to the risk of major incidents with severe potential consequences due to local environment and important presence of NGO’s. Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site. The project is focused on delivering the lowest possible cost, which requires challenging TotalEnergies design concepts as well as substantially challenging the TotalEnergies referential.

    Multicultural environment:
    Contractors are anticipated to be located in various parts of the world. Ugandan rules and regulations, administrative requirements and technical authorizations as well as international codes for onshore plant will apply. The Pre-commissioning Leader must navigate these challenges while ensuring efficient and safe execution of all Pre-commissioning activities across multiple disciplines and locations

    Reporting line in organization Construction Manager/ RSES

    Activities
    Main Missions
    Planning and Coordination:
    • Develop and update short-term plans and look-ahead plans for the Oil Treatment Unit (OTU), work in line with the overall project schedule.
    • Coordinate daily and weekly work fronts with site supervisors, discipline leads, and subcontractors to optimize resource allocation and the sequencing of activities. Work Monitoring :
    • Track and monitor the daily progress of OTU activities (installation, alignment, mechanical, electrical, and instrumentation connections).
    • Monitor the status of critical equipment, long-lead items, and materials required for OTU.
    • Ensure the tracking of engineering deliverables, shop drawings, and technical submissions. Technical Support and Interfaces :
    • Assist site teams in resolving technical queries and clarifying construction details.
    • Coordinate with mechanical, electrical, instrumentation, and commissioning teams to ensure a smooth workflow and timely handovers. Pre-commissioning and Readiness:
    • Monitor pre-commissioning activities, punch list completion, and preparation for OTU commissioning.
    • Verify the conformity of auxiliary systems (fuel gas, air intake, lubrication, controls) before handover. Communication and Reporting:
    • Serve as a communication liaison between SINOPEC and the project team.
    • Translate and clarify technical requirements, documentation, and meeting outcomes to ensure mutual understanding.
    • Prepare concise daily reports on progress, issues, and required actions.
    • Maintain accurate records of meetings, decisions, and follow-up actions.

    Context and environment
    The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area, and within densely populated area in a rural and remote part of Uganda.
    Activities exposed to the risk of major incidents with severe potential consequences due to local environment and important presence of NGO’s.
    Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site.
    The project is focused on delivering the lowest possible cost, which requires challenging TotalEnergies design concepts as well as substantially challenging the TotalEnergies referential.
    Multicultural environment: Contractors/subcontractors are anticipated to be located in various parts of the world. Ugandan rules and regulations, administrative requirements and technical authorizations as well as international codes for onshore plant will apply.

    Accountabilities
    • To ensure the daily coordination, planning, and monitoring of all activities related to the Oil Treatment Unit (OTU), located on the project's critical path.
    • To serve as the primary interface between SINOPEC our EPSCC Contractor and the project team, ensuring that all requirements are clearly communicated, understood, and implemented.
    • To facilitate progress, tracking across engineering, procurement, construction, and pre-commissioning to expedite preparation for OTU commissioning