UFR QA/QC Lead Engineering

  • Paris, France
  • Start Date : 01/09/2024
  • Contract type : Consulting
  • City : Paris
  • Published on : 27/06/2024

Description

MISSIONS / SERVICE DIMENSIONS
The Service holder will be responsible for coordinating QA and QC activities and supporting the package manager on all quality matters, within the B58 UFR teams for the Suriname GPI Project.

ACTIVITIES
Adopt and demonstrate exemplary behavior regarding H3SE policies and procedures, implementing H3SE rules and requirements within the relevant area of responsibility and complying with H3SE training requirements.
Adopt and demonstrate exemplary behavior regarding Company Ethics and “Code of Conduct” policy and promote the re-enforcement of the Anti-Corruption Program.
During the Service execution, the Service holder will need to ensure that:
• Project QMS will be duly implemented by all team members of the UFR package.
• The UFR EPC and Service Contractor Quality Management System will be fully developed, established & maintained in compliance with the EPC Contract, and that specifically, but not limited to, will be in line with Contract Exhibit H.
• The UFR EPC and Service holder will be enforcing contractual commitments; will be implementing its own Contract Quality Plan and Objectives, and will be safely, effectively, and timely performing its activities according to the Company specifications, designs, and codes.
• The EPC and Service holder will be controlling specifically the most relevant ISO 9001 processes such as quality audit, quality NC management, corrective and preventive actions management, KPI management, quality inspections, lesson learnt and feedback management, calibration and testing management, and technical standards management.
• The service holder will also be controlling the most relevant ISO 9001 processes, including quality audit, quality NC management, corrective and preventive actions management, KPI management, lesson learnt, and feedback management.
The Service will need to provide supervision of the day-to-day Contractors’ quality activities and witness/monitor/review the Supervisors/Inspectors' activities during the Engineering, Procurement, Construction, and Service works carried out by UFR Contractor or subcontractors.
The service holder will be responsible for approving the UFR Contractor’s Project Quality Plan and specific components/parts/sub-assembly/assembly, Inspection Test, and any other quality document of the UFR contractors or vendors or subcontractors.
UFR Contractor standard quality activities will need to be always followed, together with being attentive to identifying any gaps with Project-specific quality requirements.
The Service will provide follow-up, coordinate, and with the assistance of local Supervisors/Inspectors, the quality system at the Contractor’s manufacturing sites, fabrication yards, and key sub-vendors facilities.
The Service holder will be producing, finalizing, and distributing Quality Dossiers, including all the necessary certifications as well as the finalization of the manufacturing record book associated with item deliverables, promptly.
The Service holder will liaise with Third Party Inspection and Certification authorities, directing them regarding key issues in terms of timing and locations and providing them with all tech specs to carry out the work.
The Service holder will be monitoring, correcting, and reporting the Contractor’s working practices and work deliverables, as needed.
The Service Provider will consistently liaise actively with the COMPANY Project Quality Manager and other members of the project Quality Team as well as the UFR Team.

CONTEXT & ENVIRONNENT
The activity takes place in the context of the execution phase of a major project in Suriname. The Suriname GPI is a multidisciplinary team that coordinates the studies managed by TotalEnergies OneTech on the Deep and Shallow Water discoveries of offshore Suriname Block 58.
The technical challenges the GPI / Project will face are the reservoir development and management, FPSO, and subsea production/injection system.
The Suriname Team will develop the Project with the objectives of maximizing economic results by optimizing the reserves, and the schedule, reducing the costs and the Greenhouse Gas (GHG) emission, while maintaining the technical quality of the installations, with high H3SE requirements and focusing.
DURATION / LOCATION
- Start date: ASAP
- Duration: 1 year minimum to 5 years after UFR package contract award
- Renewable: Yes
- Location (country/site): Start in Paris, then at the Contractor's Main office with follow-up at manufacturing & construction locations
- Status: Residential

QUALIFICATIONS & EXPERIENCE REQUIRED
- Knowledge of the UFR Products and relevant Quality regime
- Significant working experience in a similar service within the Oil and Gas field
- Languages: Fluent in French and English
- Professional Experience: 15 years minimum
- Experience within project/s: 10 years minimum