- Start Date : 01/03/2026
- Published on : 07/01/2026
Description
Duration & Location
LocationSite, Buliisa, Uganda
Commencement dateQ1 2026
Duration12 months
StatusRotational
Qualifications/Experience required
Qualification:Diploma of Higher Education or BTCE. Education in operational safety, production operations, wellOperations
Experience:
Professional experience > 10 years, and 3 years in a similar position
Good technical skills in O&G.
Teaching skills Advanced in DCS
Familiar with MC Office
Good knowledge of TotalEnergies HSE Safety Rules, SIMOPS, PTW System, or equivalent in Oil & Gas industry.
Ability to work under pressure and stressful conditions.
Responsible, able to take decisions
Adaptability and ability to work in an international environment.
Good communication skills.
Clear and concise reporting both verbal and written Fluent in English.
Reporting line in organization: CRO Leader, N+2 Prod SPV
Activities
Start-up preparation
During commissioning: Participate in commissioning activities from simple function tests up, loop checks to Operational Test Procedures.
Confirm all alarms and trip set points.
Review start-upprocedures and provide recommendations for improvement.
Contribute to preparation of Reflex sheets for the CRO.
Make maximum use of OTS prior to start-up to train junior CRO in coordination with OTS trainer.
Start-up:
Take key part in plant start-up. Operate plan in Control Room during start-up and first oil period.
Coach the junior CRO on all aspects of the job.
Monitor and operate DCS and other CRO interfaces:
Oversee processes to ensure safe and stable processingongoing including well production and injection, process and utilities. Identify bottle necking and offer solutions.
Process overview: Clearly understand process and function of all equipment of operation.
Understand and be able to act immediately as soon as an abnormality is identified.
Follow instructions and procedures from engineering and management regarding wells, CPF and utility operations. Give recommendations for improvement.
Well performance and ESP (ESCPC) operation:
Manage ESP and well operations, understand process and be able troubleshoot when required.
Gas, water, sand, wax and hard sediments management in wells.
Analize and take decisions to provide safe ESP and well operations.
Adjust well and ESP (ESCPC) parameters as soon as deviation is identified.
Offer better wells regime.
Process management and adjustment: Identify abnormalize of operating parameters.
Manage and adjust process parameters in real-time to ensure operations align with safety guidelines and production process.
Implement recommendation of engineering and supervising.
Providing production and injection target:
Work closely with production and well performance team for strictly following instructions.
Act immediately as soon as abnormalize identified.
Ensuring shortfalls minimizes both production and injection targets.
Sales nomination targets: Provide strict export nominations as approved.
Act immediately as soon as abnormalize identified.
Start-up well pads and CPF:
Start process during first oil and after shutdowns. Lead wells start-up after drilling and work over as same as after dewaxing and other well interventions. Implement clean up and adjust wells operation parameters safely.
Emergency: React immediately in case of emergency. Be sure that the system works properly and safely. Understand all safety equipment in operations and operate it in case of process safety incidents including integrity failure.• PTW: Ensures correct follow up of defined mitigation measures mentioned in PTW and Job Safety Analysis. Implement inhibitions for the jobs and reinstate them according to the work management system.
Adherence to Safety: Follow all safety protocols and operational guidelines to maintain a safe working environment. Report any safety issues or unusual conditions immediately.
Collaboration and tasking: Work closely with production operators of CPF and Well Pads. Assigning tasks and coordinating activities to maintain efficient workflow.
Reporting and documentation: Prepare regular production reports. Maintain logs and ensure all is accurate and up to date.
HMI and DCS: Report about inconvenience, bags, etc. Offer improvement of the system, prepare requests for modification or notifications for MNT.
Notifications: Identify unnormal behavior of operating equipment and prepare notifications for MNT. Keep informed Prod SPV. Also, offer new solutions for the operation and process, get information for request for modification.
Lessons Learned System: Participate in Lesson Learned System. Register new events properly with corrective mitigations. Be proactive and control implementation requested mitigations.
Leadership. Act as a technical leader on site for site operators focusing on CRO newcomers and sharing information you have with colleagues.
Context and environment
There is no equivalent project of such an industrial drilling magnitude in a remote and sensitive area within the Company today.
The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area, and within densely populated area in a rural and remote part of Uganda.
Activities exposed to the risk of major incidents with severe potential consequences due to local environment and important presence of NGOs.
Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site.
The project is focused on delivering the lowest possible cost, which requires challenging TotalEnergies design concepts as well as substantially challenging the TotalEnergies referential.Heavy and waxy oils will be produced from 29 well pads, (with 9 located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bwpd of water treatment capacity.
Reservoir pressure maintenance is ensured either by water injection and by polymer water injection depending on the reservoir’s characteristics.
The project also includes an extended interconnecting network with temperature preservation. LPG extraction, storage and tankers loading facilities are part of the CPF facilities.Multicultural environment Ugandan rules and regulations, administrative requirements and technical authorizations as well as international codes for onshore plant will apply. Due to staggered development on CPF, it is expected that SIMOPS (Operations vs Construction), will occur on CPF.
Accountabilities
Starting up the plant safely.
Sharing experience with newcomers CRO.
Safe and strict compliance with work management systems and operational procedures.
Achieving targets and nominations, act immediately in case of deviations.
Keep process ongoing safe and act immediately in case of emergency.
Minimize short falls for production and injection.
Keep reporting up to date.
Clear communication regarding process and safety in condition of shifts and rotations.
LocationSite, Buliisa, Uganda
Commencement dateQ1 2026
Duration12 months
StatusRotational
Qualifications/Experience required
Qualification:Diploma of Higher Education or BTCE. Education in operational safety, production operations, wellOperations
Experience:
Professional experience > 10 years, and 3 years in a similar position
Good technical skills in O&G.
Teaching skills Advanced in DCS
Familiar with MC Office
Good knowledge of TotalEnergies HSE Safety Rules, SIMOPS, PTW System, or equivalent in Oil & Gas industry.
Ability to work under pressure and stressful conditions.
Responsible, able to take decisions
Adaptability and ability to work in an international environment.
Good communication skills.
Clear and concise reporting both verbal and written Fluent in English.
Reporting line in organization: CRO Leader, N+2 Prod SPV
Activities
Start-up preparation
During commissioning: Participate in commissioning activities from simple function tests up, loop checks to Operational Test Procedures.
Confirm all alarms and trip set points.
Review start-upprocedures and provide recommendations for improvement.
Contribute to preparation of Reflex sheets for the CRO.
Make maximum use of OTS prior to start-up to train junior CRO in coordination with OTS trainer.
Start-up:
Take key part in plant start-up. Operate plan in Control Room during start-up and first oil period.
Coach the junior CRO on all aspects of the job.
Monitor and operate DCS and other CRO interfaces:
Oversee processes to ensure safe and stable processingongoing including well production and injection, process and utilities. Identify bottle necking and offer solutions.
Process overview: Clearly understand process and function of all equipment of operation.
Understand and be able to act immediately as soon as an abnormality is identified.
Follow instructions and procedures from engineering and management regarding wells, CPF and utility operations. Give recommendations for improvement.
Well performance and ESP (ESCPC) operation:
Manage ESP and well operations, understand process and be able troubleshoot when required.
Gas, water, sand, wax and hard sediments management in wells.
Analize and take decisions to provide safe ESP and well operations.
Adjust well and ESP (ESCPC) parameters as soon as deviation is identified.
Offer better wells regime.
Process management and adjustment: Identify abnormalize of operating parameters.
Manage and adjust process parameters in real-time to ensure operations align with safety guidelines and production process.
Implement recommendation of engineering and supervising.
Providing production and injection target:
Work closely with production and well performance team for strictly following instructions.
Act immediately as soon as abnormalize identified.
Ensuring shortfalls minimizes both production and injection targets.
Sales nomination targets: Provide strict export nominations as approved.
Act immediately as soon as abnormalize identified.
Start-up well pads and CPF:
Start process during first oil and after shutdowns. Lead wells start-up after drilling and work over as same as after dewaxing and other well interventions. Implement clean up and adjust wells operation parameters safely.
Emergency: React immediately in case of emergency. Be sure that the system works properly and safely. Understand all safety equipment in operations and operate it in case of process safety incidents including integrity failure.• PTW: Ensures correct follow up of defined mitigation measures mentioned in PTW and Job Safety Analysis. Implement inhibitions for the jobs and reinstate them according to the work management system.
Adherence to Safety: Follow all safety protocols and operational guidelines to maintain a safe working environment. Report any safety issues or unusual conditions immediately.
Collaboration and tasking: Work closely with production operators of CPF and Well Pads. Assigning tasks and coordinating activities to maintain efficient workflow.
Reporting and documentation: Prepare regular production reports. Maintain logs and ensure all is accurate and up to date.
HMI and DCS: Report about inconvenience, bags, etc. Offer improvement of the system, prepare requests for modification or notifications for MNT.
Notifications: Identify unnormal behavior of operating equipment and prepare notifications for MNT. Keep informed Prod SPV. Also, offer new solutions for the operation and process, get information for request for modification.
Lessons Learned System: Participate in Lesson Learned System. Register new events properly with corrective mitigations. Be proactive and control implementation requested mitigations.
Leadership. Act as a technical leader on site for site operators focusing on CRO newcomers and sharing information you have with colleagues.
Context and environment
There is no equivalent project of such an industrial drilling magnitude in a remote and sensitive area within the Company today.
The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area, and within densely populated area in a rural and remote part of Uganda.
Activities exposed to the risk of major incidents with severe potential consequences due to local environment and important presence of NGOs.
Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site.
The project is focused on delivering the lowest possible cost, which requires challenging TotalEnergies design concepts as well as substantially challenging the TotalEnergies referential.Heavy and waxy oils will be produced from 29 well pads, (with 9 located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bwpd of water treatment capacity.
Reservoir pressure maintenance is ensured either by water injection and by polymer water injection depending on the reservoir’s characteristics.
The project also includes an extended interconnecting network with temperature preservation. LPG extraction, storage and tankers loading facilities are part of the CPF facilities.Multicultural environment Ugandan rules and regulations, administrative requirements and technical authorizations as well as international codes for onshore plant will apply. Due to staggered development on CPF, it is expected that SIMOPS (Operations vs Construction), will occur on CPF.
Accountabilities
Starting up the plant safely.
Sharing experience with newcomers CRO.
Safe and strict compliance with work management systems and operational procedures.
Achieving targets and nominations, act immediately in case of deviations.
Keep process ongoing safe and act immediately in case of emergency.
Minimize short falls for production and injection.
Keep reporting up to date.
Clear communication regarding process and safety in condition of shifts and rotations.